Renewable sites › Ongar Landfill Scheme
Ongar Landfill Scheme
Ongar Landfill Scheme is an operational 1 MW landfill gas site in Epping Forest, generating since 1 July 2004. REPD does not record the planning grant date. Operator of record: Waste Recycling Group.
Planning and build timeline
| Application submitted | 4 July 2003 |
| Permission granted | not recorded |
| Operational | 1 July 2004 |
Screening a site of your own?
Redline runs the record on your own boundary in Epping Forest: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Ongar Landfill Scheme’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Epping Forest
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Landfill Gas · Operational | 1.8 | 0.1 km |
Battery · Operational | 10 | 9.5 km |
Solar Photovoltaics · Operational | 0.26 | 11.7 km |
Landfill Gas · Operational | 1.3 | 12.4 km |
Solar Photovoltaics · Operational | 49.9 | 14.5 km |
Battery · Operational | 49.9 | 14.5 km |
How big is Ongar Landfill Scheme?
Ongar Landfill Scheme has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Ongar Landfill Scheme?
REPD records the operator as Waste Recycling Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Ongar Landfill Scheme approved and built?
The application was submitted on 4 July 2003. REPD does not record a grant date. The site became operational on 1 July 2004.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 669.
Novarly Parcel · official public data, read properly · parcel.novarly.com