Fairwind Farm is an operational 10 MW solar farm in Thurrock, generating since 30 September 2014. Planning permission was granted on 25 November 2013, 6 months after submission. Operator of record: MS Power Projects Ltd.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 30 September 2014
Solar Photovoltaics
Technology
MS Power Projects Ltd
Thurrock
Authority
England

Planning and build timeline

Application submitted10 June 2013
Permission granted25 November 2013
6 months after submission
Operational30 September 2014
10 months after consent

Screening a site of your own?

RedlineUK · £39

Thurrock approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Fairwind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Thurrock’s record on solar

Thurrock has decided 17 solar farms and approved 94%, taking a median of 2.4 months. See every solar farm decision in Thurrock

Other built sites within 15 km

SiteMWDistance
Battery · Operational
280.3 km
Solar Photovoltaics · Operational
5.22.2 km
Solar Photovoltaics · Operational
49.93 km
Battery · Operational
49.93 km
Battery · Under Construction
4.4 km
Solar Photovoltaics · Under Construction
49.94.4 km
Solar Photovoltaics · Under Construction
49.95.3 km
Solar Photovoltaics · Operational
386.5 km

How big is Fairwind Farm?

Fairwind Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Fairwind Farm?

REPD records the operator as MS Power Projects Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Fairwind Farm approved and built?

The application was submitted on 10 June 2013. Permission was granted on 25 November 2013, 6 months later. The site became operational on 30 September 2014, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1763.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode