Novarly ParcelRenewable sites

Renewable sitesHowdon STW

Howdon STW

Howdon STW is operational in South Tyneside with a recorded capacity of 6 MW, and has been generating since 2012-09-01.

6 MW
Capacity
as recorded in REPD
Operational
Status
since 2012-09-01
Sewage Sludge Digestion
Technology
Northumbrian Water
South Tyneside
Authority
England

Planning and build timeline

Application submitted2010-07-21
Permission granted2010-10-14
3 months after submission
Operational2012-09-01
23 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Standby Embedded Stor Power Plant - Battery storage
Battery · Under Construction
203.2 km
Port of Tyne
Battery · Operational
353.7 km
Tynemouth Energy Storage System (TESS)
Battery · Operational
255 km
Seghill Village Waste Disposal Site phase 1 and 2
Landfill Gas · Operational
4.19 km
Nissan Test Track
Solar Photovoltaics · Operational
4.89.9 km
Unipres building
Solar Photovoltaics · Operational
4.910.5 km
Nissan Motors Plant Extn
Wind Onshore · Operational
210.9 km
Nissan Wind Farm
Wind Onshore · Operational
410.9 km

How big is Howdon STW?

Howdon STW has a recorded installed capacity of 6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Howdon STW?

REPD records the operator as Northumbrian Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Howdon STW approved and built?

The application was submitted on 2010-07-21. Permission was granted on 2010-10-14, 3 months later. The site became operational on 2012-09-01, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2394.