Solar planning in East Lothian

East Lothian has decided 6 solar farms and approved 100% of them, taking a median of 1.8 months to decide. Consented capacity: 3 MW.

100%
Approved
6 granted · 0 refused
1.8 mo
Median decision
UK 2.3 mo
3 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How East Lothian compares

Against the 298 UK authorities with 5+ solar decisions, East Lothian sits in the 77th percentile for approval rate (7 points above the England average) and the 74th percentile for speed.

Decisions by year

35Approved — 1 (2012)112Approved — 1 (2020)120Approved — 2 (2023)223Approved — 1 (2024)124Approved — 1 (2025)125
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (6)

SchemeMWStatusDecided
Smeaton Nursery Garden, Smeaton - Solar Panels
Smeaton Estate · 25/00119/P · 1.8 mo to decide
0.15Awaiting Construction2025-04-09
Meadow Stores, Ormiston - Solar Panels
Cefetra Limited · 24/00822/P · 1.9 mo to decide
0.24Awaiting Construction2024-11-01
Seton Sands, Holiday Village - Solar Panels
Bourne Leisure Limited · 23/00396/P · 1 mo to decide
0.17Awaiting Construction2023-06-29
Dunbar Waste Water Treatment Works, Beltonford Hedderwick - Solar Panels
Scottish Water · 22/01317/P · 1.4 mo to decide
0.26Awaiting Construction2023-01-10
Howden Farm
Howden Eggs · 20/00238/P · 1.7 mo to decide
0.2Operational2020-04-27
Dunbar Energy Park
Hallhill Developments · 11/00868/PM · 5.1 mo to decide
2Planning Permission Expired2012-03-07

Does East Lothian approve solar farms?

Yes — of the 6 solar farms East Lothian has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in East Lothian?

The median time from application to decision is 1.8 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has East Lothian consented?

3 MW has been consented across 6 approved schemes. There are no applications currently awaiting a decision.

Other technologies in East Lothian

Battery storage in East LothianOnshore wind in East Lothian

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.