Renewable sites › B H K UK Davy Drive - Solar Panels
B H K UK Davy Drive - Solar Panels
B H K UK Davy Drive - Solar Panels is under construction in County Durham with a recorded capacity of 1.34 MW.
Planning and build timeline
| Application submitted | 2022-03-30 |
| Permission granted | 2022-07-04 3 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
County Durham’s record on solar
County Durham has decided 46 solar farms and approved 93%, taking a median of 2 months. See every solar farm decision in County Durham →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Peterlee Solar Farm Solar Photovoltaics · Operational | 5 | 0.7 km |
Haswell Moor Wind Onshore · Operational | 10 | 3.1 km |
Hare Hill (B) Wind Onshore · Operational | 2.7 | 3.5 km |
Hare Hill Wind Onshore · Operational | 1.3 | 3.5 km |
Hawthorn Grid Site - Battery Storage Battery · Operational | 49 | 4.1 km |
High Haswell Wind Farm Wind Onshore · Operational | 4 | 4.9 km |
Southern Law Wind Onshore · Operational | 5.2 | 7.1 km |
Trimdon Grange Wind Onshore · Operational | 5.2 | 7.5 km |
How big is B H K UK Davy Drive - Solar Panels?
B H K UK Davy Drive - Solar Panels has a recorded installed capacity of 1.34 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates B H K UK Davy Drive - Solar Panels?
REPD records the operator as BHK (UK) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was B H K UK Davy Drive - Solar Panels approved and built?
The application was submitted on 2022-03-30. Permission was granted on 2022-07-04, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10988.