High Sharpley Wind Farm is operational in County Durham with a recorded capacity of 2.6 MW, and has been generating since 2006-12-01.

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-12-01
Wind Onshore
Technology
REG Windpower (previously Cornwall Light & Power)
County Durham
Authority
England

Planning and build timeline

Application submitted2002-04-09
Permission granted2002-06-13
2 months after submission
Operational2006-12-01
54 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

County Durham’s record on onshore wind

County Durham has decided 30 onshore wind schemes and approved 63%, taking a median of 10.5 months. See every onshore wind scheme decision in County Durham

Other built sites within 15 km

SiteMWDistance
South Sharpley Wind Farm (Revised)
Wind Onshore · Operational
7.54.2 km
Hawthorn Grid Site - Battery Storage
Battery · Operational
495.7 km
Great Eppleton Farm Repowering
Wind Onshore · Operational
8.25.9 km
Great Eppleton Wind Farm
Wind Onshore · Operational
35.9 km
Houghton-le-Spring Landfill Site
Landfill Gas · Operational
37.3 km
Peterlee Solar Farm
Solar Photovoltaics · Operational
57.5 km
B H K UK Davy Drive - Solar Panels
Solar Photovoltaics · Under Construction
1.348 km
High Haswell Wind Farm
Wind Onshore · Operational
48.4 km

How big is High Sharpley Wind Farm?

High Sharpley Wind Farm has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates High Sharpley Wind Farm?

REPD records the operator as REG Windpower (previously Cornwall Light & Power). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was High Sharpley Wind Farm approved and built?

The application was submitted on 2002-04-09. Permission was granted on 2002-06-13, 2 months later. The site became operational on 2006-12-01, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3092.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council