Novarly ParcelRenewable sites

Renewable sitesHigh Sharpley Wind Farm

High Sharpley Wind Farm

High Sharpley Wind Farm is an operational 2.6 MW onshore wind farm in County Durham, generating since 1 December 2006. Planning permission was granted on 13 June 2002, 2 months after submission. Operator of record: REG Windpower (previously Cornwall Light & Power).

2.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2006
Wind Onshore
Technology
REG Windpower (previously Cornwall Light & Power)
County Durham
Authority
England

Planning and build timeline

Application submitted9 April 2002
Permission granted13 June 2002
2 months after submission
Operational1 December 2006
54 months after consent

Screening a site of your own?

RedlineUK · £39

County Durham approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with High Sharpley Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

County Durham’s record on onshore wind

County Durham has decided 30 onshore wind schemes and approved 63%, taking a median of 10.5 months. See every onshore wind scheme decision in County Durham

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
7.54.2 km
Battery · Operational
495.7 km
Wind Onshore · Operational
35.9 km
Wind Onshore · Operational
8.25.9 km
Landfill Gas · Operational
37.3 km
Solar Photovoltaics · Operational
57.5 km
Solar Photovoltaics · Under Construction
1.348 km
Wind Onshore · Operational
48.4 km

How big is High Sharpley Wind Farm?

High Sharpley Wind Farm has a recorded installed capacity of 2.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates High Sharpley Wind Farm?

REPD records the operator as REG Windpower (previously Cornwall Light & Power). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was High Sharpley Wind Farm approved and built?

The application was submitted on 9 April 2002. Permission was granted on 13 June 2002, 2 months later. The site became operational on 1 December 2006, 54 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3092.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode