Halsary Wind Farm is operational in Highland with a recorded capacity of 34 MW, and has been generating since 2021-03-31.

34 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-03-31
Wind Onshore
Technology
Scottish Power Renewables
Highland
Authority
Scotland

Planning and build timeline

Application submitted2009-11-09
Permission granted2013-09-19
46 months after submission
Operational2021-03-31
90 months after consent

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Bad a Cheo Wind Farm
Wind Onshore · Operational
26.71.5 km
Achlachan Wind Farm
Wind Onshore · Operational
102.1 km
Camster
Wind Onshore · Operational
5010.4 km
Bilbster Wind Farm
Wind Onshore · Operational
3.911.5 km
Golticlay Wind Farm
Wind Onshore · Under Construction
72.611.6 km
Wathegar wind farm
Wind Onshore · Operational
1012.8 km
Camster II
Wind Onshore · Under Construction
3613.2 km
Wathegar 2 Wind Farm
Wind Onshore · Operational
18.513.4 km

How big is Halsary Wind Farm?

Halsary Wind Farm has a recorded installed capacity of 34 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Halsary Wind Farm?

REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Halsary Wind Farm approved and built?

The application was submitted on 2009-11-09. Permission was granted on 2013-09-19, 46 months later. The site became operational on 2021-03-31, 90 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4636.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council