Wathegar wind farm

Wathegar wind farm is operational in Highland with a recorded capacity of 10 MW, and has been generating since 2013-03-31.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-31
Wind Onshore
Technology
Private Developer
Highland
Authority
Scotland

Planning and build timeline

Application submitted2010-02-09
Permission granted2010-05-21
3 months after submission
Operational2013-03-31
34 months after consent

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Wathegar 2 Wind Farm
Wind Onshore · Operational
18.50.7 km
Achairn
Wind Onshore · Operational
6.21.4 km
Bilbster Wind Farm
Wind Onshore · Operational
3.91.8 km
Camster II
Wind Onshore · Under Construction
362.4 km
Camster
Wind Onshore · Operational
504.3 km
Pulteney Distillery
Biomass (dedicated) · Operational
3.58.2 km
Causeymire
Wind Onshore · Operational
48.38.2 km
Burn of Whilk
Wind Onshore · Operational
22.59.3 km

How big is Wathegar wind farm?

Wathegar wind farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Wathegar wind farm?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Wathegar wind farm approved and built?

The application was submitted on 2010-02-09. Permission was granted on 2010-05-21, 3 months later. The site became operational on 2013-03-31, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3757.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council