Renewable sitesAchlachan Wind Farm

Achlachan Wind Farm

Achlachan Wind Farm is operational in Highland with a recorded capacity of 10 MW, and has been generating since 2019-04-08.

10 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-04-08
Wind Onshore
Technology
Whirlwind Renewables
Highland
Authority
Scotland

Planning and build timeline

Application submitted2013-04-11
Permission granted2013-11-13
7 months after submission
Operational2019-04-08
65 months after consent

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Halsary Wind Farm
Wind Onshore · Operational
342.1 km
Bad a Cheo Wind Farm
Wind Onshore · Operational
26.73.5 km
Camster
Wind Onshore · Operational
5011.6 km
Bilbster Wind Farm
Wind Onshore · Operational
3.912 km
Wathegar wind farm
Wind Onshore · Operational
1013.4 km
Golticlay Wind Farm
Wind Onshore · Under Construction
72.613.6 km
Wathegar 2 Wind Farm
Wind Onshore · Operational
18.514 km
Camster II
Wind Onshore · Under Construction
3614.1 km

How big is Achlachan Wind Farm?

Achlachan Wind Farm has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Achlachan Wind Farm?

REPD records the operator as Whirlwind Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Achlachan Wind Farm approved and built?

The application was submitted on 2013-04-11. Permission was granted on 2013-11-13, 7 months later. The site became operational on 2019-04-08, 65 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4330.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council