Novarly ParcelRenewable sites

Renewable sitesBilbster Wind Farm

Bilbster Wind Farm

Bilbster Wind Farm is an operational 3.9 MW onshore wind farm in Highland, generating since 1 February 2008. REPD does not record the planning grant date. Operator of record: Private Developer.

3.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 February 2008
Wind Onshore
Technology
Private Developer
Highland
Authority
Scotland

Planning and build timeline

Application submitted23 January 2004
Permission grantednot recorded
Operational1 February 2008

Screening a site of your own?

RedlineUK · £39

Highland approves 63% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Bilbster Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Highland’s record on onshore wind

Highland has decided 99 onshore wind schemes and approved 63%, taking a median of 13.9 months. See every onshore wind scheme decision in Highland

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
101.8 km
Wind Onshore · Operational
18.52.5 km
Wind Onshore · Operational
6.23 km
Wind Onshore · Under Construction
363.9 km
Wind Onshore · Operational
504.7 km
Wind Onshore · Operational
48.39.6 km
Biomass (dedicated) · Operational
3.59.7 km
Wind Onshore · Operational
22.510.6 km

How big is Bilbster Wind Farm?

Bilbster Wind Farm has a recorded installed capacity of 3.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bilbster Wind Farm?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bilbster Wind Farm approved and built?

The application was submitted on 23 January 2004. REPD does not record a grant date. The site became operational on 1 February 2008.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3207.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode