Churn Lane, Horsmonden Solar Panels
Churn Lane, Horsmonden Solar Panels is an operational 0.5 MW solar farm in Tunbridge Wells, generating since 8 September 2021. Planning permission was granted on 18 June 2021, 4 months after submission. Operator of record: Cottage Farms Limited.
Planning and build timeline
| Application submitted | 24 February 2021 |
| Permission granted | 18 June 2021 4 months after submission |
| Operational | 8 September 2021 3 months after consent |
Screening a site of your own?
Tunbridge Wells approves 80% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Churn Lane, Horsmonden Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Tunbridge Wells’s record on solar
Tunbridge Wells has decided 20 solar farms and approved 80%, taking a median of 2.6 months. See every solar farm decision in Tunbridge Wells →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Under Construction | 49.9 | 1.6 km |
Solar Photovoltaics · Operational | 9.2 | 1.8 km |
Solar Photovoltaics · Operational | 5 | 5.3 km |
Solar Photovoltaics · Operational | 6.6 | 5.4 km |
Solar Photovoltaics · Operational | 14.3 | 7 km |
Battery · Operational | 40 | 9.4 km |
Anaerobic Digestion · Under Construction | 2 | 9.4 km |
Solar Photovoltaics · Operational | 3 | 13.4 km |
How big is Churn Lane, Horsmonden Solar Panels?
Churn Lane, Horsmonden Solar Panels has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Churn Lane, Horsmonden Solar Panels?
REPD records the operator as Cottage Farms Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Churn Lane, Horsmonden Solar Panels approved and built?
The application was submitted on 24 February 2021. Permission was granted on 18 June 2021, 4 months later. The site became operational on 8 September 2021, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8457.