Novarly ParcelRenewable sites

Renewable sitesChurn Lane, Horsmonden Solar Panels

Churn Lane, Horsmonden Solar Panels

Churn Lane, Horsmonden Solar Panels is operational in Tunbridge Wells with a recorded capacity of 0.5 MW, and has been generating since 2021-09-08.

0.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2021-09-08
Solar Photovoltaics
Technology
Cottage Farms Limited
Tunbridge Wells
Authority
England

Planning and build timeline

Application submitted2021-02-24
Permission granted2021-06-18
4 months after submission
Operational2021-09-08
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Tunbridge Wells’s record on solar

Tunbridge Wells has decided 20 solar farms and approved 80%, taking a median of 2.6 months. See every solar farm decision in Tunbridge Wells

Other built sites within 15 km

SiteMWDistance
Maidstone Road, Horsmonden - Paddock Solar Farm
Solar Photovoltaics · Under Construction
49.91.6 km
Paddock Wood
Solar Photovoltaics · Operational
9.21.8 km
Widehurst Farm
Solar Photovoltaics · Operational
55.3 km
Capel Grange Solar Park
Solar Photovoltaics · Operational
6.65.4 km
Hadlow Place solar farm
Solar Photovoltaics · Operational
14.37 km
Huggin's Hall
Battery · Operational
409.4 km
Knoxbridge Farm
Anaerobic Digestion · Under Construction
29.4 km
Kingshill Solar Farm
Solar Photovoltaics · Operational
313.4 km

How big is Churn Lane, Horsmonden Solar Panels?

Churn Lane, Horsmonden Solar Panels has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Churn Lane, Horsmonden Solar Panels?

REPD records the operator as Cottage Farms Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Churn Lane, Horsmonden Solar Panels approved and built?

The application was submitted on 2021-02-24. Permission was granted on 2021-06-18, 4 months later. The site became operational on 2021-09-08, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8457.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council