Goosehall Solar Farm is operational in East Cambridgeshire with a recorded capacity of 39.5 MW, and has been generating since 2020-08-18.

39.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2020-08-18
Solar Photovoltaics
Technology
Lightsource Renewable Energy
East Cambridgeshire
Authority
England

Planning and build timeline

Application submitted2015-07-03
Permission granted2015-11-10
4 months after submission
Operational2020-08-18
57 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Cambridgeshire’s record on solar

East Cambridgeshire has decided 21 solar farms and approved 100%, taking a median of 3.4 months. See every solar farm decision in East Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Burwell Solar Farm
Solar Photovoltaics · Under Construction
49.91.1 km
Burwell - Battery Storage
Battery · Operational
501.7 km
Breach Farm - Solar farm
Battery · Operational
0.662.7 km
Breach Farm - Solar farm
Solar Photovoltaics · Operational
49.92.7 km
Bracks Farm
Solar Photovoltaics · Operational
282.9 km
North Angle Farm
Solar Photovoltaics · Under Construction
29.43.3 km
Triangle Solar Farm Park
Solar Photovoltaics · Operational
124 km
Exning
Solar Photovoltaics · Operational
29.95.5 km

How big is Goosehall Solar Farm?

Goosehall Solar Farm has a recorded installed capacity of 39.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Goosehall Solar Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Goosehall Solar Farm approved and built?

The application was submitted on 2015-07-03. Permission was granted on 2015-11-10, 4 months later. The site became operational on 2020-08-18, 57 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5411.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council