Novarly ParcelRenewable sites

Renewable sitesGoosehall Solar Farm

Goosehall Solar Farm

Goosehall Solar Farm is an operational 39.5 MW solar farm in East Cambridgeshire, generating since 18 August 2020. Planning permission was granted on 10 November 2015, 4 months after submission. Operator of record: Lightsource Renewable Energy.

39.5 MW
Capacity
as recorded in REPD
Operational
Status
since 18 August 2020
Solar Photovoltaics
Technology
Lightsource Renewable Energy
East Cambridgeshire
Authority
England

Planning and build timeline

Application submitted3 July 2015
Permission granted10 November 2015
4 months after submission
Operational18 August 2020
57 months after consent

Screening a site of your own?

RedlineUK · £39

East Cambridgeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Goosehall Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Cambridgeshire’s record on solar

East Cambridgeshire has decided 21 solar farms and approved 100%, taking a median of 3.4 months. See every solar farm decision in East Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
49.91.1 km
Battery · Operational
501.7 km
Battery · Operational
0.662.7 km
Solar Photovoltaics · Operational
49.92.7 km
Solar Photovoltaics · Operational
282.9 km
Solar Photovoltaics · Under Construction
29.43.3 km
Solar Photovoltaics · Operational
124 km
Solar Photovoltaics · Operational
29.95.5 km

How big is Goosehall Solar Farm?

Goosehall Solar Farm has a recorded installed capacity of 39.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Goosehall Solar Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Goosehall Solar Farm approved and built?

The application was submitted on 3 July 2015. Permission was granted on 10 November 2015, 4 months later. The site became operational on 18 August 2020, 57 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5411.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode