Renewable sitesBreach Farm - Solar farm

Breach Farm - Solar farm

Breach Farm - Solar farm is an operational 0.66 MW battery storage site in East Cambridgeshire, generating since 1 December 2023. Planning permission was granted on 10 December 2021, 7 months after submission. Operator of record: Octopus Renewables Infrastructure Trust.

0.66 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2023
Battery
Technology
Octopus Renewables Infrastructure Trust
East Cambridgeshire
Authority
England

Planning and build timeline

Application submitted29 April 2021
Permission granted10 December 2021
7 months after submission
Operational1 December 2023
24 months after consent

Screening a site of your own?

RedlineUK · £39

East Cambridgeshire approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Breach Farm - Solar farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Cambridgeshire’s record on battery storage

East Cambridgeshire has decided 6 battery storage schemes and approved 100%, taking a median of 5.5 months. See every battery storage scheme decision in East Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
49.90 km
Battery · Operational
502.7 km
Solar Photovoltaics · Operational
39.52.7 km
Solar Photovoltaics · Operational
53.2 km
Solar Photovoltaics · Under Construction
49.93.2 km
Solar Photovoltaics · Operational
283.7 km
Solar Photovoltaics · Under Construction
29.44.1 km
Solar Photovoltaics · Operational
124.6 km

How big is Breach Farm - Solar farm?

Breach Farm - Solar farm has a recorded installed capacity of 0.66 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Breach Farm - Solar farm?

REPD records the operator as Octopus Renewables Infrastructure Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Breach Farm - Solar farm approved and built?

The application was submitted on 29 April 2021. Permission was granted on 10 December 2021, 7 months later. The site became operational on 1 December 2023, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9058.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode