Breach Farm - Solar farm is operational in East Cambridgeshire with a recorded capacity of 0.66 MW, and has been generating since 2023-12-01.

0.66 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-12-01
Battery
Technology
Octopus Renewables Infrastructure Trust
East Cambridgeshire
Authority
England

Planning and build timeline

Application submitted2021-04-29
Permission granted2021-12-10
7 months after submission
Operational2023-12-01
24 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Cambridgeshire’s record on battery storage

East Cambridgeshire has decided 6 battery storage schemes and approved 100%, taking a median of 5.5 months. See every battery storage scheme decision in East Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Breach Farm - Solar farm
Solar Photovoltaics · Operational
49.90 km
Burwell - Battery Storage
Battery · Operational
502.7 km
Goosehall Solar Farm
Solar Photovoltaics · Operational
39.52.7 km
Forest Heath Solar Farm
Solar Photovoltaics · Operational
53.2 km
Burwell Solar Farm
Solar Photovoltaics · Under Construction
49.93.2 km
Bracks Farm
Solar Photovoltaics · Operational
283.7 km
North Angle Farm
Solar Photovoltaics · Under Construction
29.44.1 km
Triangle Solar Farm Park
Solar Photovoltaics · Operational
124.6 km

How big is Breach Farm - Solar farm?

Breach Farm - Solar farm has a recorded installed capacity of 0.66 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Breach Farm - Solar farm?

REPD records the operator as Octopus Renewables Infrastructure Trust. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Breach Farm - Solar farm approved and built?

The application was submitted on 2021-04-29. Permission was granted on 2021-12-10, 7 months later. The site became operational on 2023-12-01, 24 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9058.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council