Burwell Solar Farm is under construction in East Cambridgeshire with a recorded capacity of 49.9 MW.

49.9 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
EDF Energy Renewables
East Cambridgeshire
Authority
England

Planning and build timeline

Application submitted2020-05-01
Permission granted2020-11-19
7 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Cambridgeshire’s record on solar

East Cambridgeshire has decided 21 solar farms and approved 100%, taking a median of 3.4 months. See every solar farm decision in East Cambridgeshire

Other built sites within 15 km

SiteMWDistance
Burwell - Battery Storage
Battery · Operational
501 km
Goosehall Solar Farm
Solar Photovoltaics · Operational
39.51.1 km
Breach Farm - Solar farm
Battery · Operational
0.663.2 km
Breach Farm - Solar farm
Solar Photovoltaics · Operational
49.93.2 km
Bracks Farm
Solar Photovoltaics · Operational
284 km
North Angle Farm
Solar Photovoltaics · Under Construction
29.44.4 km
Exning
Solar Photovoltaics · Operational
29.94.8 km
Triangle Solar Farm Park
Solar Photovoltaics · Operational
125 km

How big is Burwell Solar Farm?

Burwell Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Burwell Solar Farm?

REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Burwell Solar Farm approved and built?

The application was submitted on 2020-05-01. Permission was granted on 2020-11-19, 7 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7630.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council