Renewable sites › Burwell Solar Farm
Burwell Solar Farm
Burwell Solar Farm is under construction in East Cambridgeshire with a recorded capacity of 49.9 MW.
Planning and build timeline
| Application submitted | 2020-05-01 |
| Permission granted | 2020-11-19 7 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Cambridgeshire’s record on solar
East Cambridgeshire has decided 21 solar farms and approved 100%, taking a median of 3.4 months. See every solar farm decision in East Cambridgeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Burwell - Battery Storage Battery · Operational | 50 | 1 km |
Goosehall Solar Farm Solar Photovoltaics · Operational | 39.5 | 1.1 km |
Breach Farm - Solar farm Battery · Operational | 0.66 | 3.2 km |
Breach Farm - Solar farm Solar Photovoltaics · Operational | 49.9 | 3.2 km |
Bracks Farm Solar Photovoltaics · Operational | 28 | 4 km |
North Angle Farm Solar Photovoltaics · Under Construction | 29.4 | 4.4 km |
Exning Solar Photovoltaics · Operational | 29.9 | 4.8 km |
Triangle Solar Farm Park Solar Photovoltaics · Operational | 12 | 5 km |
How big is Burwell Solar Farm?
Burwell Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Burwell Solar Farm?
REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Burwell Solar Farm approved and built?
The application was submitted on 2020-05-01. Permission was granted on 2020-11-19, 7 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7630.
Novarly Parcel · official public data, read properly · parcel.novarly.com