Novarly ParcelRenewable sites

Renewable sitesGoonhilly Downs Wind Farm Repower

Goonhilly Downs Wind Farm Repower

Goonhilly Downs Wind Farm Repower is an operational 12 MW onshore wind farm in Cornwall, generating since 1 November 2010. Planning permission was granted on 4 August 2008, 7 months after submission. Operator of record: REG Windpower (previously Cornwall Light & Power).

12 MW
Capacity
as recorded in REPD
Operational
Status
since 1 November 2010
Wind Onshore
Technology
REG Windpower (previously Cornwall Light & Power)
Cornwall
Authority
England

Planning and build timeline

Application submitted21 December 2007
Permission granted4 August 2008
7 months after submission
Operational1 November 2010
27 months after consent

Screening a site of your own?

RedlineUK · £39

Cornwall approves 74% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Goonhilly Downs Wind Farm Repower’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on onshore wind

Cornwall has decided 35 onshore wind schemes and approved 74%, taking a median of 7.5 months. See every onshore wind scheme decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.51.3 km
Solar Photovoltaics · Operational
0.218.5 km
Solar Photovoltaics · Operational
59.2 km
Solar Photovoltaics · Operational
5.310.2 km
Solar Photovoltaics · Operational
612.3 km
Solar Photovoltaics · Operational
1.313.5 km
Anaerobic Digestion · Operational
114.3 km
Wind Onshore · Operational
1014.4 km

How big is Goonhilly Downs Wind Farm Repower?

Goonhilly Downs Wind Farm Repower has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Goonhilly Downs Wind Farm Repower?

REPD records the operator as REG Windpower (previously Cornwall Light & Power). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Goonhilly Downs Wind Farm Repower approved and built?

The application was submitted on 21 December 2007. Permission was granted on 4 August 2008, 7 months later. The site became operational on 1 November 2010, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3061.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode