Renewable sites › Roskilly's - Solar Farm
Roskilly's - Solar Farm
Roskilly's - Solar Farm is operational in Cornwall with a recorded capacity of 0.21 MW, and has been generating since 2023-10-04.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2023-10-04 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- National Landscape (AONB) — Cornwall
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Cornwall’s record on solar
Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Goonhilly Downs Wind Farm Repower Wind Onshore · Operational | 12 | 8.5 km |
Higher Tregarne Solar Farm Solar Photovoltaics · Operational | 5 | 9.3 km |
Goonhilly Downs - PV Solar Photovoltaics · Operational | 4.5 | 9.7 km |
LITTLE TREVEASE SOLAR PARK Solar Photovoltaics · Operational | 5.3 | 13.4 km |
Nancrossa Farm solar park Solar Photovoltaics · Operational | 6 | 14.6 km |
How big is Roskilly's - Solar Farm?
Roskilly's - Solar Farm has a recorded installed capacity of 0.21 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Roskilly's - Solar Farm?
REPD records the operator as Roskilly's. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Roskilly's - Solar Farm approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2023-10-04.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15002.
Novarly Parcel · official public data, read properly · parcel.novarly.com