Novarly ParcelRenewable sites

Renewable sitesRoskilly's - Solar Farm

Roskilly's - Solar Farm

Roskilly's - Solar Farm is an operational 0.21 MW solar farm in Cornwall, generating since 4 October 2023. REPD does not record the planning grant date. Operator of record: Roskilly's.

0.21 MW
Capacity
as recorded in REPD
Operational
Status
since 4 October 2023
Solar Photovoltaics
Technology
Roskilly's
Cornwall
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational4 October 2023

Screening a site of your own?

RedlineUK · £39

Cornwall approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Roskilly's - Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Cornwall’s record on solar

Cornwall has decided 146 solar farms and approved 92%, taking a median of 3.3 months. See every solar farm decision in Cornwall

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
128.5 km
Solar Photovoltaics · Operational
59.3 km
Solar Photovoltaics · Operational
4.59.7 km
Solar Photovoltaics · Operational
5.313.4 km
Solar Photovoltaics · Operational
614.6 km

How big is Roskilly's - Solar Farm?

Roskilly's - Solar Farm has a recorded installed capacity of 0.21 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Roskilly's - Solar Farm?

REPD records the operator as Roskilly's. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Roskilly's - Solar Farm approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 4 October 2023.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15002.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode