Pengelly Barton Farm is operational in Cornwall with a recorded capacity of 1 MW, and has been generating since 2017-05-15.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-05-15
Anaerobic Digestion
Technology
Pengelly Farms
Cornwall
Authority
England

Planning and build timeline

Application submitted2016-09-07
Permission granted2016-12-07
3 months after submission
Operational2017-05-15
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wheal Alfred Road Solar Farm
Solar Photovoltaics · Operational
3.55.1 km
Hope Solar Farm
Solar Photovoltaics · Operational
7.37.9 km
Nanterrow Farm
Solar Photovoltaics · Operational
4.78.7 km
Little White Alice Solar Park
Solar Photovoltaics · Operational
1.38.8 km
Hayle Wave Hub (Test Site)
Shoreline Wave · Operational
2310.1 km
LITTLE TREVEASE SOLAR PARK
Solar Photovoltaics · Operational
5.310.5 km
Nancrossa Farm solar park
Solar Photovoltaics · Operational
611.4 km
Carn Vean
Wind Onshore · Operational
1011.7 km

How big is Pengelly Barton Farm?

Pengelly Barton Farm has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pengelly Barton Farm?

REPD records the operator as Pengelly Farms. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pengelly Barton Farm approved and built?

The application was submitted on 2016-09-07. Permission was granted on 2016-12-07, 3 months later. The site became operational on 2017-05-15, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6212.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council