Gedling Solar Farm

Gedling Solar Farm is operational in Gedling with a recorded capacity of 5.7 MW, and has been generating since 2015-03-15.

5.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-15
Solar Photovoltaics
Technology
Foresight
Gedling
Authority
England

Planning and build timeline

Application submitted2012-11-21
Permission granted2013-10-23
11 months after submission
Operational2015-03-15
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Gedling’s record on solar

Gedling has decided 6 solar farms and approved 100%, taking a median of 2.3 months. See every solar farm decision in Gedling

Other built sites within 15 km

SiteMWDistance
Severn Trent Water - Stoke Bardolph Wind Turbine
Wind Onshore · Operational
1.53.1 km
Stoke Bardolph energy crop (Farm AD)
Anaerobic Digestion · Operational
23.3 km
Dorket Head
Landfill Gas · Operational
2.84.1 km
Colwick Industrial Estate (Farm and Food waste)
Anaerobic Digestion · Operational
24.5 km
Trent Basin Community Battery
Battery · Operational
0.55.9 km
Eastcroft EfW (Lines 1 & 2)
EfW Incineration · Operational
96 km
Eastcroft Municipal Depot
Solar Photovoltaics · Operational
0.186 km
Eastcroft Municipal Depot
Battery · Operational
0.66 km

How big is Gedling Solar Farm?

Gedling Solar Farm has a recorded installed capacity of 5.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Gedling Solar Farm?

REPD records the operator as Foresight. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Gedling Solar Farm approved and built?

The application was submitted on 2012-11-21. Permission was granted on 2013-10-23, 11 months later. The site became operational on 2015-03-15, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2377.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council