Trent Basin Community Battery

Trent Basin Community Battery is an operational 0.5 MW battery storage site in Nottingham, generating since 15 July 2018. REPD does not record the planning grant date. Operator of record: EvoEnergy.

0.5 MW
Capacity
as recorded in REPD
Operational
Status
since 15 July 2018
Battery
Technology
EvoEnergy
Nottingham
Authority
England

Planning and build timeline

Application submitted21 December 2016
Permission grantednot recorded
Operational15 July 2018

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Nottingham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Trent Basin Community Battery’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Battery · Operational
0.60.9 km
Solar Photovoltaics · Operational
0.180.9 km
EfW Incineration · Operational
90.9 km
Solar Photovoltaics · Operational
0.353.6 km
Solar Photovoltaics · Operational
4.24.4 km
Anaerobic Digestion · Operational
24.5 km
Solar Photovoltaics · Operational
55.2 km
Solar Photovoltaics · Operational
4.95.7 km

How big is Trent Basin Community Battery?

Trent Basin Community Battery has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Trent Basin Community Battery?

REPD records the operator as EvoEnergy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Trent Basin Community Battery approved and built?

The application was submitted on 21 December 2016. REPD does not record a grant date. The site became operational on 15 July 2018.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6993.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode