Novarly ParcelRenewable sites

Renewable sitesEastcroft EfW (Lines 1 & 2)

Eastcroft EfW (Lines 1 & 2)

Eastcroft EfW (Lines 1 & 2) is operational in Nottingham with a recorded capacity of 9 MW, and has been generating since 1975-01-01.

9 MW
Capacity
as recorded in REPD
Operational
Status
since 1975-01-01
EfW Incineration
Technology
FCC Environment
Nottingham
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1975-01-01

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Eastcroft Municipal Depot
Battery · Operational
0.60 km
Eastcroft Municipal Depot
Solar Photovoltaics · Operational
0.180 km
Trent Basin Community Battery
Battery · Operational
0.50.9 km
Willow Road - Roof mounted solar panels
Solar Photovoltaics · Operational
0.352.9 km
Colwick Industrial Estate (Farm and Food waste)
Anaerobic Digestion · Operational
25.3 km
Radcliffe Solar Farm
Solar Photovoltaics · Operational
4.25.3 km
Gedling Solar Farm
Solar Photovoltaics · Operational
5.76 km
Stragglethorpe Road farm
Solar Photovoltaics · Operational
56.1 km

How big is Eastcroft EfW (Lines 1 & 2)?

Eastcroft EfW (Lines 1 & 2) has a recorded installed capacity of 9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Eastcroft EfW (Lines 1 & 2)?

REPD records the operator as FCC Environment. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Eastcroft EfW (Lines 1 & 2) approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1975-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5780.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council