Solar planning in Gedling

Gedling has decided 6 solar farms and approved 100% of them, taking a median of 2.3 months to decide. Consented capacity: 8 MW. 1 application still awaiting a decision.

100%
Approved
6 granted · 0 refused
2.3 mo
Median decision
UK 2.3 mo
8 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (6 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Gedling compares

Against the 298 UK authorities with 5+ solar decisions, Gedling sits in the 77th percentile for approval rate (7 points above the England average) and the 51st percentile for speed.

Decisions by year

35Approved — 1 (2013)113Approved — 1 (2023)123Approved — 4 (2025)425
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (9)

SchemeMWStatusDecided
Enviro Building, Colwick - Solar Panels
Enva · PN/4748 · 2.3 mo to decide
0.26Awaiting Construction2025-07-08
ENVA England, Road Number 4 - Solar Panels
ENVA England Limited · PN/4749 · 2.3 mo to decide
1.01Awaiting Construction2025-07-08
Pintail House, Pintail Close - Solar Panels
Findel Education Limited · 2025/0202 · 1.8 mo to decide
0.41Awaiting Construction2025-05-08
Enviro Building, Colwick - Solar Panels
Enva · 2025/0258
0.26Revised2025-04-30
Enva, Colwick - Solar Panels
Enva · 2025/0184
1.01Application Withdrawn2025-04-30
Arnold Hill Spencer Academy - Solar Panels
Green Nation Solar Energy · 2025/0073 · 1.8 mo to decide
0.18Awaiting Construction2025-04-01
Colwick Loop Road, Colwick - Solar Panels
EON B2B Solutions · 2023/0529 · 1.9 mo to decide
0.75Awaiting Construction2023-09-01
Land south of Ramsdale Park Golf Course
Earthworm/ EW Capital · 2015/0862 · 10.3 mo to decide
4Abandoned2016-08-25
Gedling Solar Farm
Foresight · 2012/1335 · 11 mo to decide
5.7Operational2013-10-23

Does Gedling approve solar farms?

Yes — of the 6 solar farms Gedling has decided, 100% were approved (6 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Gedling?

The median time from application to decision is 2.3 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Gedling consented?

8 MW has been consented across 6 approved schemes. A further 1 application awaits a decision.

Other technologies in Gedling

Battery storage in GedlingOnshore wind in Gedling

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com