Novarly ParcelRenewable sites

Renewable sitesColwick Industrial Estate (Farm and Food waste)

Colwick Industrial Estate (Farm and Food waste)

Colwick Industrial Estate (Farm and Food waste) is operational in Gedling with a recorded capacity of 2 MW, and has been generating since 2014-09-30.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-09-30
Anaerobic Digestion
Technology
Bio Dynamic
Gedling
Authority
England

Planning and build timeline

Application submitted2013-08-02
Permission granted2013-09-02
1 months after submission
Operational2014-09-30
13 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Radcliffe Solar Farm
Solar Photovoltaics · Operational
4.21.9 km
Severn Trent Water - Stoke Bardolph Wind Turbine
Wind Onshore · Operational
1.52.8 km
Stoke Bardolph energy crop (Farm AD)
Anaerobic Digestion · Operational
22.9 km
Stragglethorpe Road farm
Solar Photovoltaics · Operational
52.9 km
Cotgrave solar farm
Solar Photovoltaics · Operational
4.93.9 km
Trent Basin Community Battery
Battery · Operational
0.54.5 km
Gedling Solar Farm
Solar Photovoltaics · Operational
5.74.5 km
Eastcroft Municipal Depot
Solar Photovoltaics · Operational
0.185.2 km

How big is Colwick Industrial Estate (Farm and Food waste)?

Colwick Industrial Estate (Farm and Food waste) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Colwick Industrial Estate (Farm and Food waste)?

REPD records the operator as Bio Dynamic. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Colwick Industrial Estate (Farm and Food waste) approved and built?

The application was submitted on 2013-08-02. Permission was granted on 2013-09-02, 1 months later. The site became operational on 2014-09-30, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 257.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council