Novarly ParcelRenewable sites

Renewable sitesColwick Industrial Estate (Farm and Food waste)

Colwick Industrial Estate (Farm and Food waste)

Colwick Industrial Estate (Farm and Food waste) is an operational 2 MW anaerobic digestion plant in Gedling, generating since 30 September 2014. Planning permission was granted on 2 September 2013, 1 months after submission. Operator of record: Bio Dynamic.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 30 September 2014
Anaerobic Digestion
Technology
Bio Dynamic
Gedling
Authority
England

Planning and build timeline

Application submitted2 August 2013
Permission granted2 September 2013
1 months after submission
Operational30 September 2014
13 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Gedling: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Colwick Industrial Estate (Farm and Food waste)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.21.9 km
Wind Onshore · Operational
1.52.8 km
Anaerobic Digestion · Operational
22.9 km
Solar Photovoltaics · Operational
52.9 km
Solar Photovoltaics · Operational
4.93.9 km
Battery · Operational
0.54.5 km
Solar Photovoltaics · Operational
5.74.5 km
Solar Photovoltaics · Operational
0.185.2 km

How big is Colwick Industrial Estate (Farm and Food waste)?

Colwick Industrial Estate (Farm and Food waste) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Colwick Industrial Estate (Farm and Food waste)?

REPD records the operator as Bio Dynamic. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Colwick Industrial Estate (Farm and Food waste) approved and built?

The application was submitted on 2 August 2013. Permission was granted on 2 September 2013, 1 months later. The site became operational on 30 September 2014, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 257.