Renewable sitesSevern Trent Water - Stoke Bardolph Wind Turbine

Severn Trent Water - Stoke Bardolph Wind Turbine

Severn Trent Water - Stoke Bardolph Wind Turbine is operational in Gedling with a recorded capacity of 1.5 MW, and has been generating since 2015-12-15.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-15
Wind Onshore
Technology
Severn Trent Water
Gedling
Authority
England

Planning and build timeline

Application submitted2012-12-12
Permission granted2013-09-19
9 months after submission
Operational2015-12-15
27 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Stoke Bardolph energy crop (Farm AD)
Anaerobic Digestion · Operational
20.3 km
Colwick Industrial Estate (Farm and Food waste)
Anaerobic Digestion · Operational
22.8 km
Gedling Solar Farm
Solar Photovoltaics · Operational
5.73.1 km
Radcliffe Solar Farm
Solar Photovoltaics · Operational
4.24.6 km
Stragglethorpe Road farm
Solar Photovoltaics · Operational
55.5 km
Trent Basin Community Battery
Battery · Operational
0.56.4 km
Cotgrave solar farm
Solar Photovoltaics · Operational
4.96.4 km
Dorket Head
Landfill Gas · Operational
2.86.9 km

How big is Severn Trent Water - Stoke Bardolph Wind Turbine?

Severn Trent Water - Stoke Bardolph Wind Turbine has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Severn Trent Water - Stoke Bardolph Wind Turbine?

REPD records the operator as Severn Trent Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Severn Trent Water - Stoke Bardolph Wind Turbine approved and built?

The application was submitted on 2012-12-12. Permission was granted on 2013-09-19, 9 months later. The site became operational on 2015-12-15, 27 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3897.