Rock Barracks Solar Farm
Rock Barracks Solar Farm is under construction in East Suffolk with a recorded capacity of 1.5 MW.
Planning and build timeline
| Application submitted | 2020-03-16 |
| Permission granted | 2020-12-17 9 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
- National Landscape (AONB) — Suffolk Coast & Heaths
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Suffolk’s record on solar
East Suffolk has decided 33 solar farms and approved 97%, taking a median of 3 months. See every solar farm decision in East Suffolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bentwaters CHP Biomass (dedicated) · Operational | 4.6 | 5.3 km |
Bentwaters Park Anaerobic Digestion · Operational | 2 | 5.3 km |
Bentwaters Park (extension) Anaerobic Digestion · Operational | 1.8 | 5.3 km |
Lower Ufford Lane Solar Photovoltaics · Operational | 1.1 | 5.8 km |
Foxburrow Farm Solar Photovoltaics · Operational | 8 | 8.8 km |
Foxhall Landfill Site Landfill Gas · Operational | 1.2 | 9.9 km |
Stratton Hall Solar Park Solar Photovoltaics · Operational | 11.6 | 11.5 km |
Parham Airfield (Great Glenham) Solar Photovoltaics · Operational | 17.5 | 12.2 km |
How big is Rock Barracks Solar Farm?
Rock Barracks Solar Farm has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rock Barracks Solar Farm?
REPD records the operator as Public Power Solutions (PPS). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rock Barracks Solar Farm approved and built?
The application was submitted on 2020-03-16. Permission was granted on 2020-12-17, 9 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7714.
Novarly Parcel · official public data, read properly · parcel.novarly.com