Rock Barracks Solar Farm is under construction in East Suffolk with a recorded capacity of 1.5 MW.

1.5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Public Power Solutions (PPS)
East Suffolk
Authority
England

Planning and build timeline

Application submitted2020-03-16
Permission granted2020-12-17
9 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Suffolk’s record on solar

East Suffolk has decided 33 solar farms and approved 97%, taking a median of 3 months. See every solar farm decision in East Suffolk

Other built sites within 15 km

SiteMWDistance
Bentwaters CHP
Biomass (dedicated) · Operational
4.65.3 km
Bentwaters Park
Anaerobic Digestion · Operational
25.3 km
Bentwaters Park (extension)
Anaerobic Digestion · Operational
1.85.3 km
Lower Ufford Lane
Solar Photovoltaics · Operational
1.15.8 km
Foxburrow Farm
Solar Photovoltaics · Operational
88.8 km
Foxhall Landfill Site
Landfill Gas · Operational
1.29.9 km
Stratton Hall Solar Park
Solar Photovoltaics · Operational
11.611.5 km
Parham Airfield (Great Glenham)
Solar Photovoltaics · Operational
17.512.2 km

How big is Rock Barracks Solar Farm?

Rock Barracks Solar Farm has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rock Barracks Solar Farm?

REPD records the operator as Public Power Solutions (PPS). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rock Barracks Solar Farm approved and built?

The application was submitted on 2020-03-16. Permission was granted on 2020-12-17, 9 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7714.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council