Renewable sitesGreatmoor EfW

Greatmoor EfW

Greatmoor EfW is operational in Buckinghamshire with a recorded capacity of 22 MW, and has been generating since 2016-02-23.

22 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-02-23
EfW Incineration
Technology
FCC Environment
Buckinghamshire
Authority
England

Planning and build timeline

Application submitted2011-02-18
Permission granted2012-07-26
17 months after submission
Operational2016-02-23
43 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 4 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Calvert Phase II
Landfill Gas · Operational
11.21.6 km
Westcott Venture Park
Anaerobic Digestion · Operational
27.3 km
Westcott Venture Park Phase 2 & 3
Solar Photovoltaics · Operational
1.38.2 km
Gawcott Fields Farm
Solar Photovoltaics · Operational
9.28.3 km
Buckingham Tesco Superstore
Solar Photovoltaics · Operational
0.28.4 km
Fox Covert Solar Farm
Solar Photovoltaics · Operational
228.6 km
Fox Covert Solar Farm
Battery · Operational
8.8 km
Shelswell Park Solar Farm
Solar Photovoltaics · Operational
510.4 km

How big is Greatmoor EfW?

Greatmoor EfW has a recorded installed capacity of 22 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Greatmoor EfW?

REPD records the operator as FCC Environment. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Greatmoor EfW approved and built?

The application was submitted on 2011-02-18. Permission was granted on 2012-07-26, 17 months later. The site became operational on 2016-02-23, 43 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 968.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council