Novarly ParcelRenewable sites

Renewable sitesTop Farm, Short Ferry Road - Solar PV Arrays

Top Farm, Short Ferry Road - Solar PV Arrays

Top Farm, Short Ferry Road - Solar PV Arrays is under construction in West Lindsey with a recorded capacity of 0.86 MW.

0.86 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Annakin Farms Limited
West Lindsey
Authority
England

Planning and build timeline

Application submitted2023-03-03
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Lindsey’s record on solar

West Lindsey has decided 21 solar farms and approved 86%, taking a median of 1.9 months. See every solar farm decision in West Lindsey

Other built sites within 15 km

SiteMWDistance
Fiskerton Airfield (Phase 1)
Solar Photovoltaics · Operational
125.5 km
Fiskerton Airfield (Phase 2)
Solar Photovoltaics · Operational
225.5 km
Primrose Hill Farm
Solar Photovoltaics · Operational
3.76 km
Branston Solar Park (extension)
Solar Photovoltaics · Under Construction
409.4 km
Branston solar park
Solar Photovoltaics · Operational
18.910 km
Metheringham Heath (Farm AD)
Anaerobic Digestion · Operational
6.513.6 km
Leverton Farm - Energy Barn
Battery · Operational
1014.7 km

How big is Top Farm, Short Ferry Road - Solar PV Arrays?

Top Farm, Short Ferry Road - Solar PV Arrays has a recorded installed capacity of 0.86 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Top Farm, Short Ferry Road - Solar PV Arrays?

REPD records the operator as Annakin Farms Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Top Farm, Short Ferry Road - Solar PV Arrays approved and built?

The application was submitted on 2023-03-03. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13519.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council