Renewable sites › Top Farm, Short Ferry Road - Solar PV Arrays
Top Farm, Short Ferry Road - Solar PV Arrays
Top Farm, Short Ferry Road - Solar PV Arrays is under construction in West Lindsey with a recorded capacity of 0.86 MW.
Planning and build timeline
| Application submitted | 2023-03-03 |
| Permission granted | not recorded |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Lindsey’s record on solar
West Lindsey has decided 21 solar farms and approved 86%, taking a median of 1.9 months. See every solar farm decision in West Lindsey →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Fiskerton Airfield (Phase 1) Solar Photovoltaics · Operational | 12 | 5.5 km |
Fiskerton Airfield (Phase 2) Solar Photovoltaics · Operational | 22 | 5.5 km |
Primrose Hill Farm Solar Photovoltaics · Operational | 3.7 | 6 km |
Branston Solar Park (extension) Solar Photovoltaics · Under Construction | 40 | 9.4 km |
Branston solar park Solar Photovoltaics · Operational | 18.9 | 10 km |
Metheringham Heath (Farm AD) Anaerobic Digestion · Operational | 6.5 | 13.6 km |
Leverton Farm - Energy Barn Battery · Operational | 10 | 14.7 km |
How big is Top Farm, Short Ferry Road - Solar PV Arrays?
Top Farm, Short Ferry Road - Solar PV Arrays has a recorded installed capacity of 0.86 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Top Farm, Short Ferry Road - Solar PV Arrays?
REPD records the operator as Annakin Farms Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Top Farm, Short Ferry Road - Solar PV Arrays approved and built?
The application was submitted on 2023-03-03. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 13519.