Eckland Lodge Farm is operational in North Northamptonshire with a recorded capacity of 2.9 MW, and has been generating since 2016-12-23.
Planning and build timeline
| Application submitted | 2014-10-22 |
| Permission granted | 2015-07-29 9 months after submission |
| Operational | 2016-12-23 17 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
North Northamptonshire’s record on solar
North Northamptonshire has decided 41 solar farms and approved 98%, taking a median of 2 months. See every solar farm decision in North Northamptonshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Gaultney Solar Park Solar Photovoltaics · Operational | 20.5 | 3.2 km |
New Albion Wind Farm Wind Onshore · Operational | 14.4 | 6 km |
Fernbrook AD Plant (Waste AD) Anaerobic Digestion · Operational | 1.5 | 7.3 km |
Land at Meadow Farm Solar Photovoltaics · Operational | 5 | 8.4 km |
Kelmarsh Wind Farm (Resubmission) Wind Onshore · Operational | 12.5 | 10.1 km |
Jacksons Bakery - Solar Panels Solar Photovoltaics · Under Construction | 0.63 | 12.3 km |
Pebble Hall Farm - Food Waste AD Anaerobic Digestion · Operational | 4 | 12.6 km |
Weldon Phase 1 and 2 Landfill Gas · Operational | 4 | 14 km |
How big is Eckland Lodge Farm?
Eckland Lodge Farm has a recorded installed capacity of 2.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Eckland Lodge Farm?
REPD records the operator as Stuart Howes & Son Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Eckland Lodge Farm approved and built?
The application was submitted on 2014-10-22. Permission was granted on 2015-07-29, 9 months later. The site became operational on 2016-12-23, 17 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4705.