Renewable sites › Enfield Farm
Enfield Farm
Enfield Farm is operational in East Devon with a recorded capacity of 2 MW, and has been generating since 2016-09-15.
Planning and build timeline
| Application submitted | 2014-04-30 |
| Permission granted | not recorded |
| Operational | 2016-09-15 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Hogsbrook Farm - Farm AD Anaerobic Digestion · Operational | 1 | 4.3 km |
Exeter EfW EfW Incineration · Operational | 13 | 5.8 km |
Burrowton Farm Solar Photovoltaics · Operational | 5 | 6.1 km |
Ford Oaks Solar & Green Infrastructure Facility Solar Photovoltaics · Under Construction | 30 | 6.3 km |
Crannaford Solar Farm Solar Photovoltaics · Operational | 12.5 | 6.3 km |
Coombe Farm Solar Photovoltaics · Operational | 8 | 6.4 km |
St Francis Court Farm Solar Photovoltaics · Operational | 4 | 6.8 km |
Great Houndbeare Farm Solar Photovoltaics · Operational | 10 | 6.9 km |
How big is Enfield Farm?
Enfield Farm has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Enfield Farm?
REPD records the operator as Greener For Life Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Enfield Farm approved and built?
The application was submitted on 2014-04-30. REPD does not record a grant date. The site became operational on 2016-09-15.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6390.