Renewable sites › Enfield Farm
Enfield Farm
Enfield Farm is an operational 2 MW anaerobic digestion plant in East Devon, generating since 15 September 2016. REPD does not record the planning grant date. Operator of record: Greener For Life Energy.
Planning and build timeline
| Application submitted | 30 April 2014 |
| Permission granted | not recorded |
| Operational | 15 September 2016 |
Screening a site of your own?
Redline runs the record on your own boundary in East Devon: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Enfield Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 1 | 4.3 km |
EfW Incineration · Operational | 13 | 5.8 km |
Solar Photovoltaics · Operational | 5 | 6.1 km |
Solar Photovoltaics · Under Construction | 30 | 6.3 km |
Solar Photovoltaics · Operational | 12.5 | 6.3 km |
Solar Photovoltaics · Operational | 8 | 6.4 km |
Solar Photovoltaics · Operational | 4 | 6.8 km |
Solar Photovoltaics · Operational | 10 | 6.9 km |
How big is Enfield Farm?
Enfield Farm has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Enfield Farm?
REPD records the operator as Greener For Life Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Enfield Farm approved and built?
The application was submitted on 30 April 2014. REPD does not record a grant date. The site became operational on 15 September 2016.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6390.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode