Exeter EfW

Exeter EfW is operational in Exeter with a recorded capacity of 13 MW, and has been generating since 2014-10-16.

13 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-10-16
EfW Incineration
Technology
Viridor
Exeter
Authority
England

Planning and build timeline

Application submitted2007-04-26
Permission granted2007-06-27
2 months after submission
Operational2014-10-16
88 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Heathfield 'A' Landfill
Landfill Gas · Operational
22.6 km
Enfield Farm
Anaerobic Digestion · Operational
25.8 km
St Francis Court Farm
Solar Photovoltaics · Operational
48.1 km
Burrowton Farm
Solar Photovoltaics · Operational
59.6 km
Hogsbrook Farm - Farm AD
Anaerobic Digestion · Operational
19.8 km
Crannaford Solar Farm
Solar Photovoltaics · Operational
12.510.4 km
Coombe Farm
Solar Photovoltaics · Operational
810.4 km
SAUNDERCROFT SOLAR FARM
Solar Photovoltaics · Operational
711.1 km

How big is Exeter EfW?

Exeter EfW has a recorded installed capacity of 13 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Exeter EfW?

REPD records the operator as Viridor. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Exeter EfW approved and built?

The application was submitted on 2007-04-26. Permission was granted on 2007-06-27, 2 months later. The site became operational on 2014-10-16, 88 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 939.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council