Renewable sites › Crannaford Solar Farm
Crannaford Solar Farm
Crannaford Solar Farm is an operational 12.5 MW solar farm in East Devon, generating since 31 March 2014. Planning permission was granted on 5 September 2013, 6 months after submission. Operator of record: MS Power Projects.
Planning and build timeline
| Application submitted | 28 February 2013 |
| Permission granted | 5 September 2013 6 months after submission |
| Operational | 31 March 2014 7 months after consent |
Screening a site of your own?
East Devon approves 87% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Crannaford Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Devon’s record on solar
East Devon has decided 31 solar farms and approved 87%, taking a median of 4.5 months. See every solar farm decision in East Devon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 7 | 0.7 km |
Solar Photovoltaics · Operational | 5 | 1.1 km |
Solar Photovoltaics · Operational | 4.8 | 3.6 km |
Solar Photovoltaics · Under Construction | 30 | 4.3 km |
Solar Photovoltaics · Operational | 4 | 4.4 km |
Solar Photovoltaics · Operational | 10 | 4.8 km |
Anaerobic Digestion · Operational | 2 | 6.3 km |
Solar Photovoltaics · Under Construction | 49 | 6.8 km |
How big is Crannaford Solar Farm?
Crannaford Solar Farm has a recorded installed capacity of 12.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Crannaford Solar Farm?
REPD records the operator as MS Power Projects. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Crannaford Solar Farm approved and built?
The application was submitted on 28 February 2013. Permission was granted on 5 September 2013, 6 months later. The site became operational on 31 March 2014, 7 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1984.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode