Renewable sites › Enderby Storage, Redcomb Farm
Enderby Storage, Redcomb Farm
Enderby Storage, Redcomb Farm is operational in Blaby with a recorded capacity of 49.9 MW, and has been generating since 2022-01-01.
Planning and build timeline
| Application submitted | 2017-10-13 |
| Permission granted | 2018-01-04 3 months after submission |
| Operational | 2022-01-01 48 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Blaby’s record on battery storage
Blaby has decided 5 battery storage schemes and approved 100%, taking a median of 5.3 months. See every battery storage scheme decision in Blaby →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
National Grid Enderby Substation Battery · Operational | 57 | 0.5 km |
Enderby Warren Phase II Landfill Gas · Operational | 4.9 | 0.9 km |
Warren Quarry Landfill Gas Scheme Landfill Gas · Operational | 1.9 | 1 km |
A C Shropshire (Farm AD) Anaerobic Digestion · Operational | 2.5 | 1.6 km |
Land at and adjacent to Leicester Forest Services Battery · Operational | 1.5 | 2.7 km |
Narborough Landfill Landfill Gas · Operational | 2.7 | 2.8 km |
Desford Solar Farm Solar Photovoltaics · Operational | 5 | 5.3 km |
Kirby Road Solar Panels Solar Photovoltaics · Under Construction | 0.49 | 5.5 km |
How big is Enderby Storage, Redcomb Farm?
Enderby Storage, Redcomb Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Enderby Storage, Redcomb Farm?
REPD records the operator as Statera Energy / Gresham House. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Enderby Storage, Redcomb Farm approved and built?
The application was submitted on 2017-10-13. Permission was granted on 2018-01-04, 3 months later. The site became operational on 2022-01-01, 48 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7044.