Novarly ParcelRenewable sites

Renewable sitesEnderby Warren Phase II

Enderby Warren Phase II

Enderby Warren Phase II is an operational 4.9 MW landfill gas site in Blaby, generating since 1 June 1999. Planning permission was granted on 25 November 1997, 4 months after submission. Operator of record: NOVERA.

4.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 June 1999
Landfill Gas
Technology
NOVERA
Blaby
Authority
England

Planning and build timeline

Application submitted31 July 1997
Permission granted25 November 1997
4 months after submission
Operational1 June 1999
18 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Blaby: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Enderby Warren Phase II’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.90.1 km
Battery · Operational
570.5 km
Battery · Operational
49.90.9 km
Anaerobic Digestion · Operational
2.52.2 km
Battery · Operational
1.52.5 km
Landfill Gas · Operational
2.72.9 km
Solar Photovoltaics · Under Construction
0.495.6 km
Solar Photovoltaics · Operational
55.8 km

How big is Enderby Warren Phase II?

Enderby Warren Phase II has a recorded installed capacity of 4.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Enderby Warren Phase II?

REPD records the operator as NOVERA. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Enderby Warren Phase II approved and built?

The application was submitted on 31 July 1997. Permission was granted on 25 November 1997, 4 months later. The site became operational on 1 June 1999, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 539.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode