Renewable sitesNarborough Landfill

Narborough Landfill

Narborough Landfill is operational in Blaby with a recorded capacity of 2.7 MW, and has been generating since 2005-03-11.

2.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2005-03-11
Landfill Gas
Technology
SITA UK
Blaby
Authority
England

Planning and build timeline

Application submitted2000-09-11
Permission granted2001-11-17
14 months after submission
Operational2005-03-11
40 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
A C Shropshire (Farm AD)
Anaerobic Digestion · Operational
2.51.6 km
Enderby Storage, Redcomb Farm
Battery · Operational
49.92.8 km
Enderby Warren Phase II
Landfill Gas · Operational
4.92.9 km
National Grid Enderby Substation
Battery · Operational
573 km
Warren Quarry Landfill Gas Scheme
Landfill Gas · Operational
1.93 km
Land at and adjacent to Leicester Forest Services
Battery · Operational
1.55.4 km
Blaby Solar Farm
Solar Photovoltaics · Operational
3.56.6 km
Desford Solar Farm
Solar Photovoltaics · Operational
57.8 km

How big is Narborough Landfill?

Narborough Landfill has a recorded installed capacity of 2.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Narborough Landfill?

REPD records the operator as SITA UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Narborough Landfill approved and built?

The application was submitted on 2000-09-11. Permission was granted on 2001-11-17, 14 months later. The site became operational on 2005-03-11, 40 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 711.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council