Renewable sites › Desford Solar Farm
Desford Solar Farm
Desford Solar Farm is operational in Hinckley and Bosworth with a recorded capacity of 5 MW, and has been generating since 2016-03-23.
Planning and build timeline
| Application submitted | 2014-07-07 |
| Permission granted | 2014-12-10 5 months after submission |
| Operational | 2016-03-23 15 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Hinckley and Bosworth’s record on solar
Hinckley and Bosworth has decided 25 solar farms and approved 96%, taking a median of 3 months. See every solar farm decision in Hinckley and Bosworth →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Kirby Road Solar Panels Solar Photovoltaics · Under Construction | 0.49 | 2.9 km |
Lindridge Farm Solar Photovoltaics · Operational | 5 | 3.6 km |
Bradgate Quarry Landfill Gas Scheme Landfill Gas · Operational | 2.5 | 3.8 km |
Land at and adjacent to Leicester Forest Services Battery · Operational | 1.5 | 4.3 km |
Desford Brick Works, Bagworth - Solar Panels Solar Photovoltaics · Operational | 2.6 | 4.4 km |
Halifax Farm Wind Onshore · Operational | 1.6 | 4.5 km |
Enderby Storage, Redcomb Farm Battery · Operational | 49.9 | 5.3 km |
National Grid Enderby Substation Battery · Operational | 57 | 5.4 km |
How big is Desford Solar Farm?
Desford Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Desford Solar Farm?
REPD records the operator as Trina Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Desford Solar Farm approved and built?
The application was submitted on 2014-07-07. Permission was granted on 2014-12-10, 5 months later. The site became operational on 2016-03-23, 15 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1885.