Eglish Mountain

Eglish Mountain is an operational 13.8 MW onshore wind farm in Derry City and Strabane, generating since 13 January 2017. Planning permission was granted on 29 July 2013, 102 months after submission. Operator of record: ESB (Northern Wind Power).

13.8 MW
Capacity
as recorded in REPD
Operational
Status
since 13 January 2017
Wind Onshore
Technology
ESB (Northern Wind Power)
Derry City and Strabane
Authority
Northern Ireland

Planning and build timeline

Application submitted1 February 2005
Permission granted29 July 2013
102 months after submission
Operational13 January 2017
42 months after consent

Screening a site of your own?

RedlineUK · £39

Derry City and Strabane approves 79% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Eglish Mountain’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Derry City and Strabane’s record on onshore wind

Derry City and Strabane has decided 42 onshore wind schemes and approved 79%, taking a median of 29.1 months. See every onshore wind scheme decision in Derry City and Strabane

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
20.71.5 km
Wind Onshore · Operational
27.66.3 km
Wind Onshore · Operational
158.3 km
Wind Onshore · Operational
4.611.3 km
Wind Onshore · Operational
511.5 km
Wind Onshore · Operational
5.111.6 km
Wind Onshore · Operational
1211.8 km
Biomass (dedicated) · Operational
2.112.9 km

How big is Eglish Mountain?

Eglish Mountain has a recorded installed capacity of 13.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Eglish Mountain?

REPD records the operator as ESB (Northern Wind Power). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Eglish Mountain approved and built?

The application was submitted on 1 February 2005. Permission was granted on 29 July 2013, 102 months later. The site became operational on 13 January 2017, 42 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4264.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode