Owenreagh Extension is an operational 5.1 MW onshore wind farm in Derry City and Strabane, generating since 1 August 2008. Planning permission was granted on 1 October 2005, 21 months after submission. Operator of record: EF Energy.

5.1 MW
Capacity
as recorded in REPD
Operational
Status
since 1 August 2008
Wind Onshore
Technology
EF Energy
Derry City and Strabane
Authority
Northern Ireland

Planning and build timeline

Application submitted1 January 2004
Permission granted1 October 2005
21 months after submission
Operational1 August 2008
34 months after consent

Screening a site of your own?

RedlineUK · £39

Derry City and Strabane approves 79% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Owenreagh Extension’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Derry City and Strabane’s record on onshore wind

Derry City and Strabane has decided 42 onshore wind schemes and approved 79%, taking a median of 29.1 months. See every onshore wind scheme decision in Derry City and Strabane

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
50.5 km
Biomass (dedicated) · Operational
2.16.9 km
Wind Onshore · Operational
13.811.6 km
Wind Onshore · Operational
912.8 km
Wind Onshore · Operational
27.613 km
Wind Onshore · Operational
20.713.1 km
Wind Onshore · Operational
513.3 km
Wind Onshore · Operational
1513.7 km

How big is Owenreagh Extension?

Owenreagh Extension has a recorded installed capacity of 5.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Owenreagh Extension?

REPD records the operator as EF Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Owenreagh Extension approved and built?

The application was submitted on 1 January 2004. Permission was granted on 1 October 2005, 21 months later. The site became operational on 1 August 2008, 34 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2927.