Curryfree Wind Farm is an operational 15 MW onshore wind farm in Derry City and Strabane, generating since 1 August 2011. Planning permission was granted on 12 May 2008, 42 months after submission. Operator of record: ESB.
Planning and build timeline
| Application submitted | 24 November 2004 |
| Permission granted | 12 May 2008 42 months after submission |
| Operational | 1 August 2011 39 months after consent |
Screening a site of your own?
Derry City and Strabane approves 79% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Curryfree Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
Derry City and Strabane’s record on onshore wind
Derry City and Strabane has decided 42 onshore wind schemes and approved 79%, taking a median of 29.1 months. See every onshore wind scheme decision in Derry City and Strabane →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 27.6 | 2 km |
Wind Onshore · Operational | 4.6 | 4.3 km |
Wind Onshore · Operational | 13.8 | 8.3 km |
Wind Onshore · Operational | 20.7 | 8.4 km |
Biomass (dedicated) · Operational | 2.1 | 10.3 km |
Biomass (dedicated) · Operational | 15 | 12.5 km |
Wind Onshore · Operational | 12 | 12.9 km |
Wind Onshore · Operational | 5 | 13.4 km |
How big is Curryfree Wind Farm?
Curryfree Wind Farm has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Curryfree Wind Farm?
REPD records the operator as ESB. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Curryfree Wind Farm approved and built?
The application was submitted on 24 November 2004. Permission was granted on 12 May 2008, 42 months later. The site became operational on 1 August 2011, 39 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3243.