Curryfree Wind Farm

Curryfree Wind Farm is operational in Derry City and Strabane with a recorded capacity of 15 MW, and has been generating since 2011-08-01.

15 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-08-01
Wind Onshore
Technology
ESB
Derry City and Strabane
Authority
Northern Ireland

Planning and build timeline

Application submitted2004-11-24
Permission granted2008-05-12
42 months after submission
Operational2011-08-01
39 months after consent

Derry City and Strabane’s record on onshore wind

Derry City and Strabane has decided 42 onshore wind schemes and approved 79%, taking a median of 29.1 months. See every onshore wind scheme decision in Derry City and Strabane

Other built sites within 15 km

SiteMWDistance
Slieve Kirk
Wind Onshore · Operational
27.62 km
Clondermot Turbines
Wind Onshore · Operational
4.64.3 km
Eglish Mountain
Wind Onshore · Operational
13.88.3 km
Townlands of Carrickatane
Wind Onshore · Operational
20.78.4 km
Tyrone Energy 1
Biomass (dedicated) · Operational
2.110.3 km
Evermore Renewable Energy (CHP) / Lisahally Power Station
Biomass (dedicated) · Operational
1512.5 km
Monnaboy Wind Farm
Wind Onshore · Operational
1212.9 km
Owenreagh Wind Farm
Wind Onshore · Operational
513.4 km

How big is Curryfree Wind Farm?

Curryfree Wind Farm has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Curryfree Wind Farm?

REPD records the operator as ESB. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Curryfree Wind Farm approved and built?

The application was submitted on 2004-11-24. Permission was granted on 2008-05-12, 42 months later. The site became operational on 2011-08-01, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3243.