Edintore Wind Farm is operational in Moray with a recorded capacity of 18 MW, and has been generating since 2016-10-31.

18 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-10-31
Wind Onshore
Technology
Vento Ludens
Moray
Authority
Scotland

Planning and build timeline

Application submitted2010-12-11
Permission granted2012-08-28
21 months after submission
Operational2016-10-31
50 months after consent

Moray’s record on onshore wind

Moray has decided 13 onshore wind schemes and approved 77%, taking a median of 16.4 months. See every onshore wind scheme decision in Moray

Other built sites within 15 km

SiteMWDistance
Blackhillock Electricity Substation - Battery Energy Storage System
Battery · Under Construction
3001.7 km
Cairnborrow
Wind Onshore · Operational
106 km
Glenfiddich Distillery
Anaerobic Digestion · Operational
1.511.2 km
Garbet Windfarm - Wind Farm & Storage facility
Wind Onshore · Under Construction
46.212 km
Garbet Windfarm - Wind Farm & Storage facility
Battery · Under Construction
312 km
Netherton of Windyhills
Wind Onshore · Operational
4.612.6 km
Myreton Crossroads
Wind Onshore · Operational
1.612.6 km
Speyside Biomass CHP Plant
Biomass (dedicated) · Operational
12.514.8 km

How big is Edintore Wind Farm?

Edintore Wind Farm has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Edintore Wind Farm?

REPD records the operator as Vento Ludens. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Edintore Wind Farm approved and built?

The application was submitted on 2010-12-11. Permission was granted on 2012-08-28, 21 months later. The site became operational on 2016-10-31, 50 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4072.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council