Renewable sites › Edintore Wind Farm
Edintore Wind Farm
Edintore Wind Farm is operational in Moray with a recorded capacity of 18 MW, and has been generating since 2016-10-31.
Planning and build timeline
| Application submitted | 2010-12-11 |
| Permission granted | 2012-08-28 21 months after submission |
| Operational | 2016-10-31 50 months after consent |
Moray’s record on onshore wind
Moray has decided 13 onshore wind schemes and approved 77%, taking a median of 16.4 months. See every onshore wind scheme decision in Moray →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Blackhillock Electricity Substation - Battery Energy Storage System Battery · Under Construction | 300 | 1.7 km |
Cairnborrow Wind Onshore · Operational | 10 | 6 km |
Glenfiddich Distillery Anaerobic Digestion · Operational | 1.5 | 11.2 km |
Garbet Windfarm - Wind Farm & Storage facility Wind Onshore · Under Construction | 46.2 | 12 km |
Garbet Windfarm - Wind Farm & Storage facility Battery · Under Construction | 3 | 12 km |
Netherton of Windyhills Wind Onshore · Operational | 4.6 | 12.6 km |
Myreton Crossroads Wind Onshore · Operational | 1.6 | 12.6 km |
Speyside Biomass CHP Plant Biomass (dedicated) · Operational | 12.5 | 14.8 km |
How big is Edintore Wind Farm?
Edintore Wind Farm has a recorded installed capacity of 18 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Edintore Wind Farm?
REPD records the operator as Vento Ludens. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Edintore Wind Farm approved and built?
The application was submitted on 2010-12-11. Permission was granted on 2012-08-28, 21 months later. The site became operational on 2016-10-31, 50 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4072.