Renewable sites › Glenfiddich Distillery
Glenfiddich Distillery
Glenfiddich Distillery is operational in Moray with a recorded capacity of 1.5 MW, and has been generating since 2015-12-15.
Planning and build timeline
| Application submitted | 2013-09-28 |
| Permission granted | not recorded |
| Operational | 2015-12-15 |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Garbet Windfarm - Wind Farm & Storage facility Battery · Under Construction | 3 | 1.1 km |
Garbet Windfarm - Wind Farm & Storage facility Wind Onshore · Under Construction | 46.2 | 1.1 km |
Speyside Biomass CHP Plant Biomass (dedicated) · Operational | 12.5 | 6.8 km |
Rothes Bio-Plant Biomass (dedicated) · Operational | 8.3 | 9.5 km |
Edintore Wind Farm Wind Onshore · Operational | 18 | 11.2 km |
Dorenell Wind Farm (Previously Site A and B Scaut Hill) Wind Onshore · Operational | 177 | 11.6 km |
Blackhillock Electricity Substation - Battery Energy Storage System Battery · Under Construction | 300 | 12.7 km |
Cairnborrow Wind Onshore · Operational | 10 | 13.5 km |
How big is Glenfiddich Distillery?
Glenfiddich Distillery has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Glenfiddich Distillery?
REPD records the operator as William Grant and Sons Distillers. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Glenfiddich Distillery approved and built?
The application was submitted on 2013-09-28. REPD does not record a grant date. The site became operational on 2015-12-15.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7477.