Renewable sites › Glenfiddich Distillery
Glenfiddich Distillery
Glenfiddich Distillery is an operational 1.5 MW anaerobic digestion plant in Moray, generating since 15 December 2015. REPD does not record the planning grant date. Operator of record: William Grant and Sons Distillers.
Planning and build timeline
| Application submitted | 28 September 2013 |
| Permission granted | not recorded |
| Operational | 15 December 2015 |
Screening a site of your own?
Redline runs the record on your own boundary in Moray: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Glenfiddich Distillery’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Under Construction | 46.2 | 1.1 km |
Battery · Under Construction | 3 | 1.1 km |
Biomass (dedicated) · Operational | 12.5 | 6.8 km |
Biomass (dedicated) · Operational | 8.3 | 9.5 km |
Wind Onshore · Operational | 18 | 11.2 km |
Wind Onshore · Operational | 177 | 11.6 km |
Battery · Under Construction | 300 | 12.7 km |
Wind Onshore · Operational | 10 | 13.5 km |
How big is Glenfiddich Distillery?
Glenfiddich Distillery has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Glenfiddich Distillery?
REPD records the operator as William Grant and Sons Distillers. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Glenfiddich Distillery approved and built?
The application was submitted on 28 September 2013. REPD does not record a grant date. The site became operational on 15 December 2015.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7477.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode