Novarly ParcelRenewable sites

Renewable sitesGlenfiddich Distillery

Glenfiddich Distillery

Glenfiddich Distillery is operational in Moray with a recorded capacity of 1.5 MW, and has been generating since 2015-12-15.

1.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-15
Anaerobic Digestion
Technology
William Grant and Sons Distillers
Moray
Authority
Scotland

Planning and build timeline

Application submitted2013-09-28
Permission grantednot recorded
Operational2015-12-15

Other built sites within 15 km

SiteMWDistance
Garbet Windfarm - Wind Farm & Storage facility
Battery · Under Construction
31.1 km
Garbet Windfarm - Wind Farm & Storage facility
Wind Onshore · Under Construction
46.21.1 km
Speyside Biomass CHP Plant
Biomass (dedicated) · Operational
12.56.8 km
Rothes Bio-Plant
Biomass (dedicated) · Operational
8.39.5 km
Edintore Wind Farm
Wind Onshore · Operational
1811.2 km
Dorenell Wind Farm (Previously Site A and B Scaut Hill)
Wind Onshore · Operational
17711.6 km
Blackhillock Electricity Substation - Battery Energy Storage System
Battery · Under Construction
30012.7 km
Cairnborrow
Wind Onshore · Operational
1013.5 km

How big is Glenfiddich Distillery?

Glenfiddich Distillery has a recorded installed capacity of 1.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Glenfiddich Distillery?

REPD records the operator as William Grant and Sons Distillers. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Glenfiddich Distillery approved and built?

The application was submitted on 2013-09-28. REPD does not record a grant date. The site became operational on 2015-12-15.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7477.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council