Renewable sites › Garbet Windfarm - Wind Farm & Storage facility
Garbet Windfarm - Wind Farm & Storage facility
Garbet Windfarm - Wind Farm & Storage facility is under construction in Moray with a recorded capacity of 46.2 MW.
Planning and build timeline
| Application submitted | 2021-01-11 |
| Permission granted | 2021-11-26 10 months after submission |
| Operational | not recorded |
Moray’s record on onshore wind
Moray has decided 13 onshore wind schemes and approved 77%, taking a median of 16.4 months. See every onshore wind scheme decision in Moray →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Garbet Windfarm - Wind Farm & Storage facility Battery · Under Construction | 3 | 0 km |
Glenfiddich Distillery Anaerobic Digestion · Operational | 1.5 | 1.1 km |
Speyside Biomass CHP Plant Biomass (dedicated) · Operational | 12.5 | 7.2 km |
Rothes Bio-Plant Biomass (dedicated) · Operational | 8.3 | 10.1 km |
Dorenell Wind Farm (Previously Site A and B Scaut Hill) Wind Onshore · Operational | 177 | 10.6 km |
Edintore Wind Farm Wind Onshore · Operational | 18 | 12 km |
Blackhillock Electricity Substation - Battery Energy Storage System Battery · Under Construction | 300 | 13.6 km |
Cairnborrow Wind Onshore · Operational | 10 | 14 km |
How big is Garbet Windfarm - Wind Farm & Storage facility?
Garbet Windfarm - Wind Farm & Storage facility has a recorded installed capacity of 46.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Garbet Windfarm - Wind Farm & Storage facility?
REPD records the operator as Energiekontor UK Limited / Uniper. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Garbet Windfarm - Wind Farm & Storage facility approved and built?
The application was submitted on 2021-01-11. Permission was granted on 2021-11-26, 10 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8468.
Novarly Parcel · official public data, read properly · parcel.novarly.com