Novarly ParcelRenewable sites

Renewable sitesEast Lenham Solar Farm

East Lenham Solar Farm

East Lenham Solar Farm is operational in Maidstone with a recorded capacity of 6.6 MW, and has been generating since 2014-03-30.

6.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-30
Solar Photovoltaics
Technology
Laurence Associates
Maidstone
Authority
England

Planning and build timeline

Application submitted2012-01-20
Permission granted2012-11-01
9 months after submission
Operational2014-03-30
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Maidstone’s record on solar

Maidstone has decided 18 solar farms and approved 83%, taking a median of 1.9 months. See every solar farm decision in Maidstone

Other built sites within 15 km

SiteMWDistance
Former Pluckley Landfill Site
Landfill Gas · Operational
16.4 km
Oaklands Farm
Solar Photovoltaics · Operational
6.99.4 km
Plot 2B EurolinkV
Battery · Under Construction
2013.8 km
Knoxbridge Farm
Anaerobic Digestion · Under Construction
214.1 km
Station Road - Solar Array
Solar Photovoltaics · Operational
0.1714.5 km
Bobbing solar farm
Solar Photovoltaics · Operational
11.314.6 km
Tonge Corner Farm
Solar Photovoltaics · Operational
2215 km

How big is East Lenham Solar Farm?

East Lenham Solar Farm has a recorded installed capacity of 6.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates East Lenham Solar Farm?

REPD records the operator as Laurence Associates. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was East Lenham Solar Farm approved and built?

The application was submitted on 2012-01-20. Permission was granted on 2012-11-01, 9 months later. The site became operational on 2014-03-30, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1816.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council