Knoxbridge Farm

Knoxbridge Farm is under construction in Tunbridge Wells with a recorded capacity of 2 MW.

2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Anaerobic Digestion
Technology
Fridays & Rika Biofuels
Tunbridge Wells
Authority
England

Planning and build timeline

Application submitted2015-06-04
Permission granted2015-09-03
3 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Widehurst Farm
Solar Photovoltaics · Operational
54.3 km
Huggin's Hall
Battery · Operational
406.6 km
Maidstone Road, Horsmonden - Paddock Solar Farm
Solar Photovoltaics · Under Construction
49.99.1 km
Churn Lane, Horsmonden Solar Panels
Solar Photovoltaics · Operational
0.59.4 km
Paddock Wood
Solar Photovoltaics · Operational
9.211.2 km
Former Pluckley Landfill Site
Landfill Gas · Operational
114 km
East Lenham Solar Farm
Solar Photovoltaics · Operational
6.614.1 km
Capel Grange Solar Park
Solar Photovoltaics · Operational
6.614.9 km

How big is Knoxbridge Farm?

Knoxbridge Farm has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Knoxbridge Farm?

REPD records the operator as Fridays & Rika Biofuels. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Knoxbridge Farm approved and built?

The application was submitted on 2015-06-04. Permission was granted on 2015-09-03, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5561.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council