Knoxbridge Farm

Knoxbridge Farm is a 2 MW anaerobic digestion plant under construction in Tunbridge Wells. Planning permission was granted on 3 September 2015, 3 months after submission. Operator of record: Fridays & Rika Biofuels.

2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Anaerobic Digestion
Technology
Fridays & Rika Biofuels
Tunbridge Wells
Authority
England

Planning and build timeline

Application submitted4 June 2015
Permission granted3 September 2015
3 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Tunbridge Wells: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Knoxbridge Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
54.3 km
Battery · Operational
406.6 km
Solar Photovoltaics · Under Construction
49.99.1 km
Solar Photovoltaics · Operational
0.59.4 km
Solar Photovoltaics · Operational
9.211.2 km
Landfill Gas · Operational
114 km
Solar Photovoltaics · Operational
6.614.1 km
Solar Photovoltaics · Operational
6.614.9 km

How big is Knoxbridge Farm?

Knoxbridge Farm has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Knoxbridge Farm?

REPD records the operator as Fridays & Rika Biofuels. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Knoxbridge Farm approved and built?

The application was submitted on 4 June 2015. Permission was granted on 3 September 2015, 3 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5561.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode