Dunbar Power Plant

Dunbar Power Plant is operational in East Lothian with a recorded capacity of 14 MW, and has been generating since 2004-12-01.

14 MW
Capacity
as recorded in REPD
Operational
Status
since 2004-12-01
Landfill Gas
Technology
Viridor
East Lothian
Authority
Scotland

Planning and build timeline

Application submitted2003-03-01
Permission granted2003-10-10
7 months after submission
Operational2004-12-01
14 months after consent

Other built sites within 15 km

SiteMWDistance
Dunbar
Landfill Gas · Operational
2.20.3 km
Dunbar EfW (previously Oxwellmains EfW)
EfW Incineration · Operational
25.60.4 km
Aikengall II, Wester Dod Community Wind Farm
Wind Onshore · Operational
60.86.7 km
Aikengall
Wind Onshore · Operational
486.7 km
Crystal Rig Wind Farm Phase III
Wind Onshore · Operational
13.87.1 km
Ferneylea Farm
Wind Onshore · Operational
1.57.2 km
Hoprigshiels Community Wind Farm
Wind Onshore · Operational
6.97.4 km
Kinegar Quarry
Wind Onshore · Operational
57.5 km

How big is Dunbar Power Plant?

Dunbar Power Plant has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dunbar Power Plant?

REPD records the operator as Viridor. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dunbar Power Plant approved and built?

The application was submitted on 2003-03-01. Permission was granted on 2003-10-10, 7 months later. The site became operational on 2004-12-01, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 793.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council