Dunbar

Dunbar is an operational 2.2 MW landfill gas site in East Lothian, generating since 1 December 2004. Planning permission was granted on 28 February 2002, 5 months after submission. Operator of record: Viridor.

2.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 December 2004
Landfill Gas
Technology
Viridor
East Lothian
Authority
Scotland

Planning and build timeline

Application submitted19 September 2001
Permission granted28 February 2002
5 months after submission
Operational1 December 2004
33 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in East Lothian: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dunbar’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
140.3 km
EfW Incineration · Operational
25.60.6 km
Wind Onshore · Operational
60.86.5 km
Wind Onshore · Operational
486.5 km
Wind Onshore · Operational
1.56.9 km
Wind Onshore · Operational
6.97.1 km
Wind Onshore · Operational
13.87.1 km
Wind Onshore · Operational
57.2 km

How big is Dunbar?

Dunbar has a recorded installed capacity of 2.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dunbar?

REPD records the operator as Viridor. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dunbar approved and built?

The application was submitted on 19 September 2001. Permission was granted on 28 February 2002, 5 months later. The site became operational on 1 December 2004, 33 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 794.