Dragonhall Farm, Padanaram - Battery Storage

Dragonhall Farm, Padanaram - Battery Storage is under construction in Angus with a recorded capacity of 10 MW.

10 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Ecosse Solar Parks Limited
Angus
Authority
Scotland

Planning and build timeline

Application submitted2021-05-12
Permission grantednot recorded
Operationalnot recorded

Angus’s record on battery storage

Angus has decided 18 battery storage schemes and approved 94%, taking a median of 6.2 months. See every battery storage scheme decision in Angus

Other built sites within 15 km

SiteMWDistance
Dragonhall Farm, Padanaram - Solar Photovoltaic Array
Solar Photovoltaics · Under Construction
50 km
Whitehills Energy Storage Facility
Battery · Under Construction
49.94.2 km
Lochhead Landfill Scheme
Landfill Gas · Operational
26.1 km
Ark Hill
Wind Onshore · Operational
6.411.4 km
Pressock Farm
Solar Photovoltaics · Operational
514.6 km

How big is Dragonhall Farm, Padanaram - Battery Storage?

Dragonhall Farm, Padanaram - Battery Storage has a recorded installed capacity of 10 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dragonhall Farm, Padanaram - Battery Storage?

REPD records the operator as Ecosse Solar Parks Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dragonhall Farm, Padanaram - Battery Storage approved and built?

The application was submitted on 2021-05-12. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9066.