Dragonhall Farm, Padanaram - Solar Photovoltaic Array

Dragonhall Farm, Padanaram - Solar Photovoltaic Array is a 5 MW solar farm under construction in Angus. Planning permission was granted on 22 September 2021, 4 months after submission. Operator of record: Ecosse Solar Parks Limited.

5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Ecosse Solar Parks Limited
Angus
Authority
Scotland

Planning and build timeline

Application submitted12 May 2021
Permission granted22 September 2021
4 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Angus approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Dragonhall Farm, Padanaram - Solar Photovoltaic Array’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Angus’s record on solar

Angus has decided 30 solar farms and approved 97%, taking a median of 4 months. See every solar farm decision in Angus

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
100 km
Battery · Under Construction
49.94.2 km
Landfill Gas · Operational
26.1 km
Wind Onshore · Operational
6.411.4 km
Solar Photovoltaics · Operational
514.6 km

How big is Dragonhall Farm, Padanaram - Solar Photovoltaic Array?

Dragonhall Farm, Padanaram - Solar Photovoltaic Array has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dragonhall Farm, Padanaram - Solar Photovoltaic Array?

REPD records the operator as Ecosse Solar Parks Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dragonhall Farm, Padanaram - Solar Photovoltaic Array approved and built?

The application was submitted on 12 May 2021. Permission was granted on 22 September 2021, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9065.