Dragonhall Farm, Padanaram - Solar Photovoltaic Array

Dragonhall Farm, Padanaram - Solar Photovoltaic Array is under construction in Angus with a recorded capacity of 5 MW.

5 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Ecosse Solar Parks Limited
Angus
Authority
Scotland

Planning and build timeline

Application submitted2021-05-12
Permission granted2021-09-22
4 months after submission
Operationalnot recorded

Angus’s record on solar

Angus has decided 30 solar farms and approved 97%, taking a median of 4 months. See every solar farm decision in Angus

Other built sites within 15 km

SiteMWDistance
Dragonhall Farm, Padanaram - Battery Storage
Battery · Under Construction
100 km
Whitehills Energy Storage Facility
Battery · Under Construction
49.94.2 km
Lochhead Landfill Scheme
Landfill Gas · Operational
26.1 km
Ark Hill
Wind Onshore · Operational
6.411.4 km
Pressock Farm
Solar Photovoltaics · Operational
514.6 km

How big is Dragonhall Farm, Padanaram - Solar Photovoltaic Array?

Dragonhall Farm, Padanaram - Solar Photovoltaic Array has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Dragonhall Farm, Padanaram - Solar Photovoltaic Array?

REPD records the operator as Ecosse Solar Parks Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Dragonhall Farm, Padanaram - Solar Photovoltaic Array approved and built?

The application was submitted on 2021-05-12. Permission was granted on 2021-09-22, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9065.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council