Novarly ParcelRenewable sites

Renewable sitesHagshaw Hill Wind Farm Extension

Hagshaw Hill Wind Farm Extension

Hagshaw Hill Wind Farm Extension is an operational 26 MW onshore wind farm in South Lanarkshire, generating since 1 October 2008. Planning permission was granted on 28 December 2005, 12 months after submission. Operator of record: Scottish Power Renewables.

26 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2008
Wind Onshore
Technology
Scottish Power Renewables
South Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted10 January 2005
Permission granted28 December 2005
12 months after submission
Operational1 October 2008
33 months after consent

Screening a site of your own?

RedlineUK · £39

South Lanarkshire approves 73% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hagshaw Hill Wind Farm Extension’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

South Lanarkshire’s record on onshore wind

South Lanarkshire has decided 49 onshore wind schemes and approved 73%, taking a median of 15.9 months. See every onshore wind scheme decision in South Lanarkshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
7.81.3 km
Wind Onshore · Operational
7.81.3 km
Wind Onshore · Under Construction
1.62.5 km
Wind Onshore · Operational
482.5 km
Wind Onshore · Under Construction
783 km
Wind Onshore · Operational
453 km
Battery · Under Construction
203 km
Wind Onshore · Operational
153.7 km

How big is Hagshaw Hill Wind Farm Extension?

Hagshaw Hill Wind Farm Extension has a recorded installed capacity of 26 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hagshaw Hill Wind Farm Extension?

REPD records the operator as Scottish Power Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hagshaw Hill Wind Farm Extension approved and built?

The application was submitted on 10 January 2005. Permission was granted on 28 December 2005, 12 months later. The site became operational on 1 October 2008, 33 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3220.