Redhill 2
Redhill 2 is operational in Tandridge with a recorded capacity of 3 MW, and has been generating since 2001-12-10.
Planning and build timeline
| Application submitted | 1999-07-22 |
| Permission granted | 1999-11-01 3 months after submission |
| Operational | 2001-12-10 25 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
- Green Belt — Tandridge
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Patteson Court Landfill Site Landfill Gas · Operational | 1.8 | 0.9 km |
South Terminal Car Park Forecourt - Electric Vehicle Charging Forecourt Battery · Under Construction | — | 7.2 km |
Majors Hill/Turners Hill Solar Farm Solar Photovoltaics · Operational | 1.1 | 14.2 km |
Oriel High School Solar Photovoltaics · Operational | 0.19 | 14.5 km |
Dorking Battery Energy Storage System Battery · Operational | 6 | 14.6 km |
How big is Redhill 2?
Redhill 2 has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Redhill 2?
REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Redhill 2 approved and built?
The application was submitted on 1999-07-22. Permission was granted on 1999-11-01, 3 months later. The site became operational on 2001-12-10, 25 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 720.