Solar planning in Torfaen

Torfaen has decided 5 solar farms and approved 100% of them, taking a median of 3.4 months to decide. Consented capacity: 14 MW.

100%
Approved
5 granted · 0 refused
3.4 mo
Median decision
UK 2.3 mo
14 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Torfaen compares

Against the 298 UK authorities with 5+ solar decisions, Torfaen sits in the 77th percentile for approval rate (7 points above the England average) and the 23rd percentile for speed.

Decisions by year

35Approved — 1 (2015)115Approved — 1 (2016)116Approved — 2 (2019)219Approved — 1 (2026)126
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (7)

SchemeMWStatusDecided
The Grange University Hospital, Caerleon Road - Solar Car Ports
Vital Energi Utilities Ltd · 25/P/0308/FUL · 8.7 mo to decide
0.72Awaiting Construction2026-02-05
Ty Coch Hollybush Way
Torfaen CBC · 19/P/0464/FUL · 2.7 mo to decide
3Awaiting Construction2019-10-21
EFG Food And Technology Park
Eurofoods UK · 19/P/0084/FUL · 2.1 mo to decide
0.5Awaiting Construction2019-03-25
Sluvad Road Water Treatment Works
Dwr Cymru Welsh Water · 18/P/0707/FUL
1Abandoned2018-10-26
Cwrt Henllys Farm
Lightsource Renewable Energy · 15/P/00434 · 10.8 mo to decide
5Operational2016-06-16
Land East of Panteg Way
Active Renewables · 15/P/00437 · 2.9 mo to decide
5Abandoned2015-12-22
Mamhilad Solar Farm
Active Renewables · 15/P/00436 · 3.9 mo to decide
5Operational2015-12-22

Does Torfaen approve solar farms?

Yes — of the 5 solar farms Torfaen has decided, 100% were approved (5 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Torfaen?

The median time from application to decision is 3.4 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Torfaen consented?

14 MW has been consented across 5 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Torfaen

Battery storage in TorfaenOnshore wind in Torfaen

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.