Renewable sites › Evermore Renewable Energy (CHP) / Lisahally Power Station
Evermore Renewable Energy (CHP) / Lisahally Power Station
Evermore Renewable Energy (CHP) / Lisahally Power Station is an operational 15 MW biomass plant in Derry City and Strabane, generating since 23 July 2015. Planning permission was granted on 9 July 2010, 6 months after submission. Operator of record: ERE Developments.
Planning and build timeline
| Application submitted | 19 January 2010 |
| Permission granted | 9 July 2010 6 months after submission |
| Operational | 23 July 2015 60 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Derry City and Strabane: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Evermore Renewable Energy (CHP) / Lisahally Power Station’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 4.6 | 8.4 km |
Wind Onshore · Operational | 12 | 9.7 km |
Wind Onshore · Operational | 15 | 12.5 km |
Wind Onshore · Operational | 27.6 | 13 km |
How big is Evermore Renewable Energy (CHP) / Lisahally Power Station?
Evermore Renewable Energy (CHP) / Lisahally Power Station has a recorded installed capacity of 15 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Evermore Renewable Energy (CHP) / Lisahally Power Station?
REPD records the operator as ERE Developments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Evermore Renewable Energy (CHP) / Lisahally Power Station approved and built?
The application was submitted on 19 January 2010. Permission was granted on 9 July 2010, 6 months later. The site became operational on 23 July 2015, 60 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 124.